McQuay MCK050A Especificaciones Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
17
Application Information MVCU-2009
Piping Connection to the Units
Align the center of the piping and tighten the are nut suf ciently with ngers.
Finally tighten the are nut with torque wrench unit the wrench clicks.
When tightening the are nut with torque wrench, ensure the direction for tightening follows the arrow on
the wrench.
Pipe Size (mm/in) Torque (Nm)
6.35 (1/4) 18
9.52 (3/8) 42
12.70 (1/2) 55
15.88 (5/8) 65
19.05 (3/4) 78
Indoor piping
Flare nut
Flared tube
Flare joint
Spanar
Torque wrench
Vacuuming and Charging
The pre-charged outdoor unit does not need any vacuuming or charging. However once it is connected, the
connecting pipe line and the indoor unit need to be vacuumed before releasing the R22/R407C/R410A from
the outdoor unit.
1. Open the service port core cap.
2. Connect pressure gauge to the service port.
3. Connect the line to vacuum pump. Open the charging manifold valve and turn the pump on. Vacuum to -0.1
MPa (-760mmHg) or lower. (Evacuation time varies by the pump but averagely in 1 hour).
Filter Dryer
(Mclecular-Sieve Type
Note : R22 - Nil
R410A - Nil
4. After evacuation, unscrew the spindle (diagram B) for the gas to run to indoor unit.
05_Application Information.indd 1705_Application Information.indd 17 4/28/2009 11:12:34 AM4/28/2009 11:12:34 AM
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 129 130

Comentarios a estos manuales

Sin comentarios