Page 44
Ensure that:
ó The unit has been mounted solidly and rigid in position.
ó The piping and connections are leak-proof after the charging.
ó Proper wiring has been installed.
Drainage check
ó Pour some water into the left side of the drain pan (the drainage is at the right side of the unit).
Test run:
ó Conduct a test run on the unit after having perform the water drainage test and the gas leakage test.
ó Check the following items:
ó Is the electrical plug inserted fi rmly into the socket?
ó Is there any abnormal sounds from the unit?
ó Is there any abnormal vibrations on the unit or the piping?
ó Is the drainage of water smooth?
Confi rm that:
ó The condenser fan is running. Check the warm air blowing from the condensing unit.
ó The evaporator blower is running and discharge cool air.
ó The suction (low side) pressure is as recommended.
ó The remote controller incorporates a 3-minute delay protection in the circuit, whereby the outdoor condensing unit
requires about 3 minutes delay before it can start operating.
Overall Checking
Comentarios a estos manuales