McQuay MCK030A Manual de instalación Pagina 30

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 54
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 29
Page 29
Unit Installation
ó Measure and mark the position for the hanging rod. Drill the hole for the angle nut on the ceiling and fi x the
handing rod.
ó The installation template is extended according to temperature and humidity. Check on dimensions in used.
ó The dimensions of the installation template are as same as those in the ceiling opening dimensions.
ó When ceiling lamination work is not completed, be sure to fi t the installation template to the indoor unit.
NOTE:
Be Sure to discuss the ceiling drilling work with the installers
concerned.
Dimension in mm
Unit Hanging
ó Confi rm the pitch of the hanging rod is 620.4mm×790.0mm sharp.
ó Attach the hanger bracket with the nut and washer to the hanging rod. Hold the unit and hang it on the hanger
bracket.
ó Adjust the unit height to 35.0 mm between the indoor unit bottom surface and the ceiling surface.
ó Confi rm with a level gauge that the unit is installed horizontally and tighten the nut and bolt to prevent unit falling
and vibration.
ó Open the ceiling board along the outer edge of the paper installation template.
Spring Washer
Nut
Flat Washer
Nut
Ceiling Board
Indoor unit
35mm
Flat Washer
Hanging Rod
Vista de pagina 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 53 54

Comentarios a estos manuales

Sin comentarios