Refrigerant Piping Work
Refrigerant piping is important in particular. Refrigeration cycle of the split air conditioner is realized by the perfect
piping work.
Piping length and elevation
If the piping is too long, both the capacity and reliability of unit will drop. As the number of bends increase, resistance
to fl ow of refrigerant system increases, thus lowering cooling capacity and as a result the compressor may become
defective. Always choose the shortest path and follow the recommendation as tabulated.
Model
Number
MWSC
010B/BR
MWSC
015B/BR
MWSC
020B/BR
MWSC
025B/BR
MWSC
030B/BR
MWSC
050B/BR
Max. Length, L 7m 10m 15m 15m 20m 20m
Max. Elevation H 5m 8m 8m 8m 10m 10m
Max. No. Of bends 10 10 10 10 10 10
Liquid pipe size 1/4” 1/4” 1/4” 3/8” 3/8” 3/8”
Gas pipe size 3/8” 1/2” 5/8” 5/8” 5/8” 3/4”
t For cooling unit, need to add external accumulator (recommended 6kg accumulator).
Liquid check trapper
Max. height
Max. height
A. Outdoor lower than indoor unit
Indoor unit
B. Outdoor unit higher than indoor unit
Outdoor unit
Indoor unit
Gas pipe
Liquid pipe
Note
:
Outdoor unit
(Set one per six meter)
Oil trapper
Installation of pipe
All system piping should be installed in accordance with local ordinances. The piping should be designed with a
minimum number of bends and changes in elevation to keep costs to a minimum and unit performance to a maximum.
A good installation should include the followings:
ó Vibration eliminators to reduce vibration and noise transmission to the building.
ó Shut-off valves are required to isolate the unit from the piping system during service.
ó Manual or automatic air vent valve at the high points of the system.
ó Some means to maintaining adequate system pressure (e.g. regulating valve and /or expansion tank )
ó Install temperature and pressure indicators at the unit pipe to aid in servicing and troubleshooting
ó Install a strainer to remove foreign matter from the water before it enters the pumps, it should be located far
enough from the upstream of pump to prevent cavitation at the inlet.