McQuay MHW Geothermal Ran Manual de instalación Pagina 7

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 38
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 6
IM 985-2 / Page 7 of 38
STOP!
If an outside air damper kit is to be installed, refer
to IM 974 for the manual damper and the motorized
damper kit and install it now.
6. Insertfastenersthroughthemountingholesinthesubbase
andnishsecuringtheunittotheoor,tighteningthe
fasteners.Donotover-tightenfastenersanddistortor
warpthesubbaseplate.
7. Locatemountingbracketsatlocationsatthewallas
shown in Figure 3.
Note: Brackets should be located approximately 3" from the
top of the chassis. A slot is provided in the sheet metal
end partition for the bracket to t into.
8. Markthepositionofthebracketmountingholesontothe
wall.Removethebracketsandusingapre-setdepthdrill,
pre-drillholestoacceptawallanchor(byothers).
WARNING
Failure to use a pre-set depth drill could result in serious injury
or death.
Note: It is preferred that the brackets are screwed directly
into a stud where available. However, drywall anchors
can be utilized when studs are absent at bracket
locations. It is the responsibility of the installing
contractor to provide the appropriate fasteners and
anchors to ensure that the unit is secured properly.
Alternate Unit Installation
(Using Provided Brackets)
Procedure
1. Withthefront,leftandrightcabinetpanelsremoved,set
theentireunitinitsnalmountingposition.
2. Withthechassisstillmountedonthesubbase,remove
ltertoallowaccesstothesubbasebottomplate.
3. Locatetheexisting1/4"mountingholesinthebottomof
thesubbaselabeled(5)in Figure 3.
Note: Make sure electrical and piping connections are in
the proper location within the subbase end piping
compartment.
4. Transferamarkwithamarkerorpenciltotheoorat
mounting hole locations (5).
5. Moveunitawaytopre-drill1/4"mountingholesinthe
ooratmarkedlocations.
IMPORTANT
Clean unit mounting area of all construction debris. Check that
the oor is level and at 90 degrees to the wall as shown in Fig-
ure 2 on page 6. McQuay recommends the placement of a
sound absorbing mat beneath the unit footprint before continu-
ing to the next installation step.
Note: Use the appropriate fasteners by others in accordance
with local building codes.
Figure 3: Mounting Bracket Installation
Left End View
Right End View
Provided
Mounting Brackets
Subbase
Chassis
(Shown removed from subbase for clarity)
Approximately 3"
5
Approximately 3"
Slot is provided
for bracket
Vista de pagina 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 37 38

Comentarios a estos manuales

Sin comentarios