McQuay MHW Geothermal Ran Manual de instalación Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 38
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
IM 985-2 / Page 5 of 38
4. Removethetwoscrews(numbered2)inFigure 1 securing
thefrontpaneltothesubbaseandremovethepanelby
liftingupandtiltingoutuntilthepaneltabscleartheslots
inthesubbase.
Note: If using the Alternate Unit Installation procedure
"(Using Provided Brackets)" on page 7 it is not
necessary to remove the top section. Continue
with step 5 if using the recommended method of
installation.
5. Open the control door and remove the four screws that
holdthetoppanelandcontrolpadinplace(numbered
3) in Figure 1.Ontheoppositeendofthecabinettoplift
offtheblank-offplatetotherightandremovethelast
twomountingscrews(numbered4)inFigure 1. Lift the
toppaneloff,turningthecontrolpadsothatittsdown
through the opening in the top panel.
Note: After removing the panels, set aside in a safe area
where they will not be damaged.
STOP!
If an outside air damper kit is to be installed, refer
to IM 974 for the manual damper and the motorized
damper kit and install it now.
6. Positionthechassis/subbaseagainstthewallwherethe
unitistobeinstalled.Removeanymouldingsattheoor
or wall (see letter A in (Figure 2). Allow adequate room
forpipingandelectricalconnectionsinthesubbaseby
checkingtheelectricalconnectionendofthesubbaseand
chassis.
Unit Installation (Recommended)
Sharp edges can cause personal injury. Avoid contact
with them.
CAUTION
WARNING
Installation and maintenance are to be performed by qualied
personnel who are familiar with local codes and Regulations,
and experienced with this type of equipment.
Installationandmaintenancearetobeperformedbyqualied
personnel who are familiar with local codes and Regulations,
and experienced with this type of equipment.
1. Consultjobblueprintsforunitlocation.Cleanarea
whereunitistobeinstalled,removingallconstruction
dirtanddebris.
2. Remove the unit from the shipping carton and save
thecartontobeusedasaprotectivecoverafterthe
installation is complete.
3. Removethescrews(numbered1)showninFigure 1,
securing the right and left side /corner panels to the
subbase.Liftthepanelsupandoutuntilthebottomtab
clearstheslotinthesubbase.
Note: Set the unit panels aside where they will not be
damaged.
Figure 1: Cabinet Panel Screw locations and Panel Removal
Right Corner Panel
Blockoff Plate
Subbase
Front Panel
Left Corner Panel
Control Door
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10 ... 37 38

Comentarios a estos manuales

Sin comentarios