McQuay MHW Geothermal Ran Manual de instalación Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 38
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9
Page 10 of 38 / IM 985-2
Optional Factory-Installed Motorized & Hand Valve
Assemblies
Consolewatersourceheatpumpscanbeconguredwith
factory-installedmotorizedvalves.Valvesshouldbemounted
onthereturnwaterline.Allvalveassembliesterminatewith
1/2"-NPTthreadedconnectionsandwillalsoaccommodate
factorysuppliedhosekits.
Note: Make sure the pipes t the connes of the piping
compartment of the heat pump unit (Figure 6).
Figure 6: Typical Motorized Valve Piping
Left End Piping View
Right End Piping (Back) View
Left End Piping (Back) View
Right End Piping View
Note: McQuay International offers a wide variety of piping
packages. Consult your local sales rep for more
information.
Wheninstallingthehosesonvalveassemblies,usethe
method as outlined in "Shutoff/BalancingValvePiping"on
page 9.
Figure 7: Typical Piping Package Configurations (Left-
Hand Unit Piping Connections Shown)
= Field-Installed
1. MeasureowDevice
2. 2-WayMotorizedIsolationValve
3. AirBleedVent
4. Supply-BypassHandValve
5. Inlet,OutletFlexible,Braided-StainlessSteelHoses
(Field-InstalledAccessories)
Note: On left hand piping units, the water supply connection
is at the top location. On right-hand piping units, the
water supply connection is at the bottom location.
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 37 38

Comentarios a estos manuales

Sin comentarios