McQuay MHW Geothermal Ran Manual de instalación Pagina 4

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 38
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 3
Page 4 of 38 / IM 985-2
Pre-Installation
WARNING
The installer must determine and follow all applicable
codes and regulations. This equipment presents hazards
of electricity, rotating parts, sharp edges, heat and weight.
Failure to read and follow these instructions can result in
property damage, severe personal injury or death. This
equipment must be installed by experienced, trained
personnel only.
1. To prevent damage, do not operate this equipment
for supplementary heating and cooling during the
construction period. Doing so will void the warranty.
2. Inspectthecartonforanyspecictaggingnumbers
indicatedbythefactoryperarequestfromtheinstalling
contractor. At this time the voltage, phase and capacity
shouldbecheckedagainsttheplans.
3. Checktheunitsizeagainsttheplanstoverifythattheunit
isbeinginstalledinthecorrectlocation.
4. Beforeinstallation,checktheavailabledimensionswhere
theunitbeinstalledversusthedimensionsoftheunit.
5. Note the location and routing of water piping, condensate
drain piping, and electrical wiring. The locations of these
itemsareclearlymarkedonsubmittaldrawings.
6. Theinstallingcontractorwillnditbenecialtoconfer
withpiping,sheetmetal,andelectricalforemenbefore
installing any unit.
Note: Check the unit data plate for correct
voltage with the plans before installing the
equipment. Also, make sure all electrical
ground connections are made in accordance
with local code.
7. The contractor shall cover the units to protect the
machinesduringnishingofthebuilding.Thisiscritical
whilesprayingreproongmaterialonbarjoists,
sandblasting,spraypaintingandplastering.Damageto
theunitduetoafailuretoprotectitduringnishingofthe
buildingisnotcoveredbythewarranty.
Receiving and Storage
Uponreceiptoftheequipment,checkcartonforvisible
damage.Makeanotationontheshippersdeliveryticket
beforesigning.Ifthereisanyevidenceofroughhandling,
immediatelyopenthecartonstocheckforconcealeddamage.
If any damage is found, notify the carrier within 48 hours to
establishyourclaimandrequesttheirinspectionandareport.
TheWarrantyClaimsDepartmentshouldthenbecontacted.
Do not stand or transport the machines on end. For storing,
eachcartonismarkedwith“up”arrows.
Intheeventthatelevatortransfermakesup-endedposition-
ingunavoidable,donotoperatethemachineuntilithasbeen
in the normal upright position for at least 24 hours.
Temporarystorageatthejobsitemustbeindoor,completely
sheltered from rain, snow, etc. High or low temperatures
naturally associated with weather patterns will not harm
the units. Excessively high temperatures, 140°F (60°C) and
higher, may deteriorate certain plastic materials and cause
permanent damage.
IMPORTANT
This product was carefully packed and thoroughly
inspected before leaving the factory. Responsibility for its
safe delivery was assumed by the carrier upon acceptance
of the shipment. Claims for loss or damage sustained in
transit must therefore be made upon the carrier as follows:
VISIBLE LOSS OR DAMAGE
Any external evidence of loss or damage must be noted
on the freight bill or carrier’s receipt, and signed by the
carrier’s agent. Failure to adequately describe such
external evidence of loss or damage may result in the
carrier’s refusal to honor a damage claim. The form
required to le such a claim will be supplied by the carrier.
CONCEALED LOSS OR DAMAGE
Concealed loss or damage means loss or damage which
does not become apparent until the product has been
unpacked. The contents may be damaged in transit due
to rough handling even though the carton may not show
external damages. When the damage is discovered upon
unpacking, make a written request for inspection by the
carrier’s agent within fteen (15) days of the delivery date
and le a claim with the carrier.
Table 1: Physical Data
Unit Size 007 009 012 015 018
Fan Wheel - D x W (In.)
4.33 x 27.24 4.33 x 27.24 4.33 x 27.24 4.33 x 35.43 4.33 x 35.43
Fan Motor Horsepower
1/30 1/30
1/30 1/18 1/18
Coil Face Area (Sq. Ft.)
1.67 1.67 1.67 2.22 2.22
Coil Rows
2 2 3 2 3
Refrigerant Charge (Oz.) 18.2 19.2 22 29.9 32
Filter, (Qty.) Size (In.)
Low Sill
(1) 23.75 x 8.75
(1) 31.75 x 8.75
High Sill
(1) 29.25 x 9.75 (1) 37.25 x 9.75
Water Connections, Female NPT (In.)
5/8 O.D. 5/8 O.D. 5/8 O.D. 5/8 O.D. 5/8 O.D.
Condensate Connections, Female NPT (In.)
3/4 I.D. 3/4 I.D. 3/4 I.D. 3/4 I.D. 3/4 I.D.
Weight, Operating (Lbs.)
138 144 146 166 171
Weight, Shipping (Lbs.) 158 164 166 196 201
Vista de pagina 3
1 2 3 4 5 6 7 8 9 ... 37 38

Comentarios a estos manuales

Sin comentarios