Installation - Floor Standing Type
STEP 1
Remove air intake grille, side panel, side close-up and side panel from the unit; see Fig E.
STEP 2
Position the floor support (field supply) as per Fig B. install the unit; see Fig I.
STEP 3
Two types of piping and drain pipe connection as Fig J.
PIPING AND DRAIN PIPE INSTALLATION
Figure I
Figure J