Installation and Maintenance Manual IM 777-7
Skyline™ Air Handler
Group: Applied Air Systems
Part Number: IM 777
Date: November 2011
© 2011 McQuay International
Models OAC/OAH 003G – 090G
Vista de pagina 0
1 2 3 4 5 6 ... 39 40

Indice de contenidos

Pagina 1 - Skyline™ Air Handler

Installation and Maintenance Manual IM 777-7Skyline™ Air HandlerGroup: Applied Air SystemsPart Number: IM 777Date: November 2011© 2011 McQuay Internat

Pagina 2 - 2 McQuay IM 777-7

10 McQuay IM 777-7Mechanical InstallationIf the unit has a top mixing box or economizer damper or a top duct connection, field fabricate and install f

Pagina 3 - Introduction

McQuay IM 777-7 11Mechanical InstallationFace and Bypass Section MountingInternal and external face and bypass sections are mounted together using the

Pagina 4

12 McQuay IM 777-7Mechanical InstallationDirect Expansion Coils• The coil distributor and suction connection extend through the end panel of the coil

Pagina 5

McQuay IM 777-7 13Mechanical InstallationFigure 21: Piping ArrangementsVacuum breaker1/2" check valveSteam main1/4" petcockfor continuousair

Pagina 6

14 McQuay IM 777-7Mechanical InstallationWater Heating Coils• Water supply and water return connections extend through the end panel of the coil secti

Pagina 7

McQuay IM 777-7 15Mechanical InstallationInternal Isolation Assembly AdjustmentOn units with internally isolated fan and motor assemblies, the assembl

Pagina 8 - Remove any

16 McQuay IM 777-7Mechanical InstallationFigure 25: Removing “Motor Behind” Shipping Brackets Figure 26: Removing “Motor Beside” Shipping BracketsFigu

Pagina 9

McQuay IM 777-7 17Electrical InstallationElectrical InstallationWiring• Electrical service to each fan must correspond to the rated voltage on the mot

Pagina 10 - Mechanical Installation

18 McQuay IM 777-7Electrical Installation• Control wiring—access to the VFD is through the fan cabinet access door for single fans. Provide shielded c

Pagina 11 - Seal holes

McQuay IM 777-7 19Operation GuidelinesOperation Guide linesStartup Checks When performing startup and service, always take thorough safety precautions

Pagina 12

2 McQuay IM 777-7Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3General Information . . . . . . . . . . . . . . .

Pagina 13

20 McQuay IM 777-7Operation Guidelines12 If multiple fans are supplied with isolation dampers, make sure the isolation dampers are fully open before s

Pagina 14 - D r a i n

McQuay IM 777-7 21Operation GuidelinesFigure 31: Wheel-to-Inlet Funnel Relationship—13 to 36 Belt-Drive Plenum FansFigure 32: Wheel-to-Inlet Funnel Re

Pagina 15

22 McQuay IM 777-7Operation GuidelinesSetscrews on MPQ fan wheels must be installed using a calibrated torque wrench to the value listed below, ±5%.Th

Pagina 16 - Unit sizes 006 - 090

McQuay IM 777-7 23Operation GuidelinesOperating LimitsDo not exceed the operating limits in Table 15 through Table 19. A fan wheel operated beyond the

Pagina 17 - Electrical Installation

24 McQuay IM 777-7Operation GuidelinesFan Vibration LevelsEach unit as shipped is trim balanced to operate smoothly. To provide satisfactory operation

Pagina 18

McQuay IM 777-7 25Service and MaintenanceService and MaintenancePeriodic Maintenance1 Check all moving parts for wear every six months.2 Check bearin

Pagina 19 - Operation Guidelines

26 McQuay IM 777-7Service and MaintenanceNote: Temperature ranges over 225°F are shown for lubricants only. High temperature applications are not sui

Pagina 20

McQuay IM 777-7 27Service and MaintenanceFigure 35: VP Type Sheave AdjustmentLVP Variable Speed SheavesMounting1 Slide sheave on motor shaft so that t

Pagina 21

28 McQuay IM 777-7Service and MaintenanceMVP Variable Speed Sheaves Mounting1 Verify both driving and driven sheaves are in alignment and the shafts a

Pagina 22

McQuay IM 777-7 29Service and MaintenanceFigure 37: Sheave AdjustmentFigure 38: Sheave AdjustmentMotorMust beparallelAdjustableSheaveCenter linesmust

Pagina 23

McQuay IM 777-7 3IntroductionIntroductionGeneral InformationThe system design and installation must follow accepted industry practice as described in

Pagina 24

30 McQuay IM 777-7Service and MaintenanceFan Drive Belt AdjustmentGeneral Rules of Tensioning1 The ideal tension is the lowest tension at which the be

Pagina 25 - Service and Maintenance

McQuay IM 777-7 31Service and MaintenanceFront Load Filter OptionFront loaded filter options require that the filters be removed and replaced from ins

Pagina 26

32 McQuay IM 777-7Service and MaintenanceCoils1 The coil must be clean to obtain maximum performance. Check once a year under normal operating conditi

Pagina 27

McQuay IM 777-7 33Service and MaintenanceRemoving the Fan SectionFor plenum fan assemblies, the entire fan cabinet may need to be removed to replace t

Pagina 28

34 McQuay IM 777-7Service and MaintenanceRemoving Stacked CoilsNote: Top and bottom stacked coils are held together with steel plate and screws on on

Pagina 29

McQuay IM 777-7 35PartsPartsReplacement PartsWhen writing to McQuay for service or replacement parts, refer to the model number and serial number of t

Pagina 30

36 McQuay IM 777-7Service and Warranty ProcedureService an d Warranty P rocedureWarrantyConsult your local McQuay Representative for warranty details.

Pagina 31

Check, Test, and Start Procedure FormTo comply with the terms of McQuay Warranty, complete and return this form within 10 days to McQuay Warranty Depa

Pagina 32

38 McQuay IM 777-7Check, Test, and Start Procedure FormPhase L2: ___________ ___________ ____________ ____________ ___________ ___________Phase L3 ___

Pagina 33

McQuay IM 777-7 39Quality Assurance Survey ReportQuality A ssurance S urvey ReportQuality Assurance Survey ReportTo whom it may concern:Please review

Pagina 34

4 McQuay IM 777-7IntroductionUnit Storage• Store on a level surface in a clean, dry location where temperature can be controlled if possible.• Pack fa

Pagina 35 - Replacement Parts

© 2011 McQuay International • www.mcquay.com • 800-432-1342 11/11McQuay Training and DevelopmentNow that you have made an investment in modern, effici

Pagina 36 - Warranty

McQuay IM 777-7 5Mechanical InstallationMechanic al InstallationService ClearancesIn addition to providing adequate space around the unit for piping c

Pagina 37

6 McQuay IM 777-7Mechanical InstallationIf the unit is supported on rails they must be placed around the entire perimeter. Additional Supports must be

Pagina 38 - 38 McQuay IM 777-7

McQuay IM 777-7 7Mechanical Installationd A length of “D” gasket is attached to each section (Figure 7). This gasket MUST be installed to the unit bas

Pagina 39 - McQuay IM 777-7 39

8 McQuay IM 777-7Mechanical InstallationPanels, Frame Channels, and DoorsPanel RemovalTo remove a side or top panel, remove the flat head Torx 30 fast

Pagina 40 - Aftermarket Services

McQuay IM 777-7 9Mechanical InstallationInjected-Foam Insulated Panels Skyline air handlers now are furnished with double-wall, injected-foam insulate